2020 Competition

Commercial 1
Project Description

​COMMERCIAL 2
The City of Smokey Bear, Nebraska is seeking for a qualified General Contractor or a Construction Manager for the construction of a new 10,000 SF, two story fire station. The estimated total project cost for this project is between 5 – 8 Million dollars.
  

​DESIGN BUILD
  1. Introduction
Castle Rock Unified School District (“The District”) is seeking a qualified Contractor to provide full service project management necessary to design and construct a new school campus master plan to replace existing modular/relocatable classrooms for The District in San Diego, CA.  The delivery method for this project is Design-Build where a Contractor will be required to partner with a design firm and deliver a complete, turn-key construction project from design inception to construction close-out.  The District is seeking a firm that will collaborate with us in producing an on-time, under budget project, which meets The Districts criteria for high quality delivery.  The selected Contractor must be knowledgeable of all requirements for working on an occupied campus, engage in daily coordination with The District operations, and above all, emphasize safety in the execution of the work.

  1. Project Description 
 The overall campus work will be a phased effort broken into three main phases. The first phase will include the removal of modular classrooms and the construction of one new building. Phase two will include renovations or new construction to replace the existing permanent buildings on campus. The third and final phase will be a sports complex on the remainder of the campus; the sports complex will include a baseball field, softball field, and a football field with a track and bleachers.

HEAVY CIVIL
​Project Description
With the country in lockdown because of the Corona virus, your company has chosen to go back to the basics and bid work that you started out doing. You will be looking into highway projects that consist of removal and replacement of existing highway lanes. This work is usually phased out so be prepared to explain how you will keep traffic flowing. You will be required to assemble a complete estimate which will include grading, aggregate base, concrete paving, asphalt work and miscellaneous subcontractor work required to support these activities. As with any highway project the schedule must always be considered to not impede the traveling public.

SPECIALTY
Project Description
​1. Introduction
The objective of this SOW is to replace deteriorating steam main support structures that overpass a main roadway at Army Ammunition Plant (AAP) campus.  The deteriorating support structrues shall be replaced with new steel frame support structures to improve safety, reduce the risk of steam outage to manufacuring buildings, and meet Missouri Department of Transportation (MODOT) road clearance requirements.  The support structures and areas of pipeline to be replaced and removed are outlined below.

2. Background
Steam mains provide steam to manufacturing buildings for process steam used in the metal forming process and for comfort heat.  Deteriorating support structures significantly increase the risk of collapsing of steam mains, which may interrupt steam distribution and shut down plant-wide production.  Additionally, failure to support structures will cause property damage, may release asbestos, and will present a significant risk of serious injury to anyone in the affected area.  The table below identifies areas that are of primary concern and need to be addressed under this effort.

3. Scope of Work
The selected contractor will be responsible for the design of the supports, based on feedback to be provided by the AAP Engineering Team. Each stage of the project will require approval from the AAP Project Manager before moving on to the next stage. The selected contractor must ensure it has adequate resources for designing, building and installing the new supports. Specific deliverables and milestones will be listed in the Work Requirements.

4. Period of Performance
The Period of Performance shall not exceed 12 months once authorization to proceed is given by the Buyer. All work must be scheduled to complete within this timeframe.